AI data centres, built from the grid up.
EESH develops and operates high-density data centres for AI on sites where grid power is already live. We lead design and construction with best-in-class partners and equip the halls with current NVIDIA systems.
Data-centre capacity developed in earlier projects.
Two AI projects: data-centre build-out and NVIDIA B300 systems. Scheduled for service in Q2 2027.
Live grid power
Project pipeline in the United States and Central Europe.
Live grid power
Live power
Many data-centre projects are waiting for a grid connection. Every EESH project, in development and in the pipeline, has live grid power.
Best-in-class builders
EESH leads design and construction. Best-in-class engineering and construction companies carry out the build.
NVIDIA Inception
Our in-house software development company is a member of the NVIDIA Inception program.
From grid to GPU, led by one team
EESH develops the site, leads the build with best-in-class engineering and construction companies, equips the hall and operates it. You work with one team from the first megawatt to the running cluster.
Develop
We secure sites where grid power is live: connection, building or land, permits and fibre.
Build
We lead design and construction to our reference design: redundant power with generator backup, air and liquid cooling side by side.
Equip
We source, rack and commission the compute: NVIDIA B300-class systems, network and storage.
Operate
We run the hall and the hardware, and report on both: uptime, utilisation, energy.
Where we build
A project pipeline of more than 100 MW across the United States and Central Europe, on sites where grid power is already live. Led from Budapest.
What you came to check
Data-centre partners
You are deciding whether to work with EESH on a site or a hall.
- Who signs the contract
- The load we bring
- Payment security
- Whose hardware, and what it runs
- How we work on your floor
Financiers
You are deciding whether to finance GPUs that EESH operates.
- Facility and site control
- Lien waiver and step-in rights
- Insurance
- Asset register and reporting
- Offtake and operating record
Offtakers
You are deciding whether to take capacity from EESH.
- What is deployable, and when
- Compute, network and storage
- Service levels and support
- Jurisdiction, security and data protection
- Contract models
Ask for the diligence pack